Las Vegas Sun

November 28, 2014

Currently: 65° — Complete forecast | Log in | Create an account

Breaking News: Bobby Hauck to resign as UNLV head football coach on Monday

Plan ahead for these road projects in the coming week in the Las Vegas Valley

Image

Las Vegas Sun photo

Here’s a look at some of the roadwork or road closings you might encounter in the coming week across the Las Vegas Valley:

SHORT-TERM PROJECTS

Nevada Department of Transportation

Northbound Buffalo Drive on-ramp to northbound U.S. 95: closed starting at 9 p.m. Sunday, Aug. 10, to prepare for widening of U.S. 95 from Ann Road to Durango Drive. Traffic will be detoured to the Durango Drive on-ramp to U.S. 95 northbound. End date:5 a.m., Friday, Aug. 15.

ONGOING PROJECTS

Nevada Department of Transportation

F Street Connection Phase 3 — Interstate 15 between Washington Avenue and U.S. 95: I-15 on-ramp at D Street is closed; southbound lanes on I-15 have been moved to the northbound side and limited to two lanes in both directions. Projected end date: summer.

Clark County

Sahara Avenue Bridge over Desert Rose Golf Course: closed as part of the Las Vegas Wash and Flamingo Wash improvements. Projected end date: September.

Nellis Boulevard south of Sahara Avenue to pedestrian bridge of Flamingo Arroyo Trail: one lane will be closed due to construction on the Las Vegas Wash project. Projected end date: early September.

Lamb Boulevard between Owens Avenue and Las Vegas Boulevard: various lanes will be closed intermittently for a street and sidewalk improvement project. Projected end date: mid-September.

Desert Inn Road between McLeod Drive and Mojave Road: various lanes will be closed for a street and sidewalk improvement project. Projected end date: early September.

Las Vegas

Main Street between Carson Avenue and U.S. 95: east half of the road will be closed to traffic for reconstruction of drainage facilities, sidewalk and roadway. Two-way traffic will be on the west side of Main Street with one travel lane in each direction.Projected end date: 2015.

Rancho Drive between Sahara Avenue and U.S. 95: intermittent lane closures while fiber optic cables, traffic signal upgrades and digital message signs are installed to improve congestion. Work will be completed from 9 p.m. to 5 a.m. in busy sections of the road and from 7 a.m. to 3:30 p.m. in residential sections. Projected end date: mid-November.

F Street between Bonanza Road and D Street: closed for bridge construction. Projected end date: Today.

Hills Center Drive between Village Center Circle and Lake Mead Boulevard: street disruption for landscaping; expect delays. Projected end date: indefinite.

Vegas Drive between Rancho Drive and Jones Boulevard: street disruption; expect delays. Projected end date: Aug. 30.

Fremont Street from 14th Street to 25th Street: street disruption; expect traffic delays. Projected end date: Aug. 10.

Lone Mountain Road west of Rainbow Boulevard: street disruption; expect delays. Projected end date: Saturday.

Racel Street between Grazing Grass Street and El Capitan Way: street disruption; expect delays. Projected end date: Oct. 28.

North Las Vegas

Carey Avenue and Revere Street: intermittent street disruptions while a roundabout is removed and replaced with traffic lights. Projected end date: fall.

Losee Road and Lone Mountain Road: street disruptions starting next week while a pedestrian bridge is being built. Projected end date: fall.

Join the Discussion:

Check this out for a full explanation of our conversion to the LiveFyre commenting system and instructions on how to sign up for an account.

Full comments policy