Offramp in Reno cause for celebration
Sunday, Oct. 31, 1999 | 3:18 a.m.
A ribbon-cutting ceremony was held Friday for the $4.6 million shortcut from the highway's northbound lanes to Sun Valley.
The slip ramp from the highway to Clear Acre Lane bypasses both McCarran Boulevard and the McCarran Bulevard onramp to the highway.
"It will save us a lot of time and save us a lot of traffic congestion on U.S. 395," Assemblyman Don Gustavson, R-Sun Valley, said at the ceremony.
Construction on the project began March 8.
archive
Most Popular
- Viewed
- Discussed
- E-mailed
- UFC Octagon Girl’s repertoire includes kick to boyfriend’s nose, arrest reports indicate
- 2012 Miss USA: Glamour shots, Best Buddies, Gordon Ramsay Steak, Sky Blu at Pure
- Diamond Dave sells it well as Van Halen pours out the power at MGM Grand
- Coroner ID’s Alabama pedestrians killed Saturday
- New UNLV forward Roscoe Smith made Sportscenter’s ‘worst play’ of 2011







Facebook Connect